ENERPRO - CASE STUDIES 2018

Rowan Norway Jack-up Rig in Dundee

Enerpro mobilises painting team, plant, equipment, support and supervisory personnel for jack up rig in Dundee

Enerpro has secured a rig maintenance project for the Rowan Norway Jack-up Rig in Dundee. Awarded by Rowan Drilling, the project will require the preparation and painting of the rig's ballast tank and internal crane pedestal. Managing Director Gordon Farquhar commented ... "Our Dundee Port facility is fully equipped to manage rig projects and upgrades, and we are always available to mobilise experienced rig personnel. Combined with our extensive range of project support services, Enerpro offer a complete rig upgrade and repair service from minor to major 5 yearly Special Periodic Surveys."


Ensco 100 jack up rig north sea

Enerpro contracted to supply scaffolding personnel and inspectors onboard Ensco 100 Jack-up Rig

Ensco Plc has awarded Enerpro with the ongoing contract to provide scaffolding personnel and scaffolding inspectors to facilitate upgrades and maintenance of the Ensco 100 Jack-up Rig. This contract comes on the back of other support work for Ensco 100. Enerpro were recently asked to perform a structural, pipework and electrical survey of the rig in preparation for upcoming shipyard scopes.


Enerpro wins string of oil & gas construction support projects for Jack-up Rig, Semi-submersible Rig, Platform and Drillship operators / UKCS North Sea

maintenance worker on rig

Enerpro undertakes maintenance repairs to existing cement unit for Blackford Dolphin Semi-submersible Rig

Enerpro were asked to carry out maintenance repairs to an existing cement unit onboard the Blackford Dolphin Semi-Submersible rig. The project involved the mobilisation of materials equipment container, specialist tools and consumables, together with experienced personnel to perform critical maintenance repairs to an existing cement unit spread. The scope of work included the welded and threading of pipework.


welding of rig tanks

Enerpro performs critical structural repairs to internal bulkheads within existing displacement tanks onboard the Heather Platform

Enerpro mobilised the relevant equipment container of materials, tools and consumables, together with a team of experienced personnel, to perform critical structural repairs to internal bulkheads within existing displacement tanks onboard the Heather Platform. The scope of work was carried out within a confined space and to industry compliant procedures and certification.


survey workers next to pipework

Enerpro carries out structural, pipework and electrical survey on Ensco 100 Drilling Rig

Enerpro were asked to perform a structural, pipework and electrical survey of the Ensco 100 drilling rig in preparation for upcoming shipyard scopes by discipline engineers. The survey was performed on a highly expedited basis due to limited bed space allotment offshore. A survey report inclusive of scope preparation was produced for onshore management evaluation.


hand showing NDT maintenance repairs

Enerpro performs Dye Penetration NDT for stainless steel fabrications

Enerpro performed Dye Penetration NDT None Destructive Testing on various stainless steel fabrications onboard the Rowan Norway in Dundee, Scotland. Project turnaround from initial client request to project completion was less than 24 hours. The rapid service was requested by the client, and a report was delivered on time.


structural analysis and modelling on computer

Enerpro undertakes structural analysis and modelling of new cement unit equipment spread for Rowan Resolute Drillship

Enerpro were asked to undertake the structural analysis and modelling of a new cement unit equipment spread for the Rowan Resolute Drillship in the Gulf of Mexico. The client required a very quick turnaround and production of a technical note to ABS satisfaction. Modelling and analysis was completed by Naval Architects and results conveyed to the onboard installation team to allow a time critical installation.


rigging services on rig

Enerpro was asked at short notice to carry out rigging services, Manicooler replacement onboard Ocean Valiant Semi-submersible Rig

Enerpro were asked at short notice to replace the Manicooler - heat exchanger manifold onboard the Ocean Valiant semi-submersible rig in Nigg, Aberdeen. Lifting plans, rigging assistance including manpower and equipment were provided and the project completed in a timely and safe manner. The project was recognised by the client for tight deadline project management, mobilising and completion.


. . . click to view 2017 case studies